Long lead times, while major manufacturers face allocation, we offer acceptable delivery times…

N-Channel JFET Switch

J111 – J113 / SST111 – SST113

 

APPLICATIONS

 

  • Analog Switches
  • Choppers
  • Commutators

 

ABSOLUTE MAXIMUM RATINGS

(TA = 25oC unless otherwise specified)

Gate-Drain or Gate-Source Voltage . . . . . . . . . . . . . . . . -35V

Gate Current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50mA

Storage Temperature Range . . . . . . . . . . . . . -55oC to +150oC

Operating Temperature Range . . . . . . . . . . . -55oC to +135oC

Lead Temperature (Soldering, 10sec) . . . . . . . . . . . . . +300oC

Power Dissipation . . . . . . . . . . . . . . . . . . . . . . . . . . . 360mW

Derate above 25oC . . . . . . . . . . . . . . . . . . . . . . 3.3mW/oC

NOTE: Stresses above those listed under “Absolute Maximum

Ratings” may cause permanent damage to the device. These are

stress ratings only and functional operation of the device at these or

any other conditions above those indicated in the operational sections

of the specifications is not implied. Exposure to absolute maximum

rating conditions for extended periods may affect device reliability.

 

ORDERING INFORMATION

Part Package Temperature Range

J111-113 Plastic TO-92 -55oC to +135oC

SST111-113 Plastic SOT-23 -55oC to +135oC

For Sorted Chips in Carriers see 2N4391 series.

For more information and complete design information,pls send us an email to  info@kruse.de
 
or visit our shop.